Call

Looking for adu / guest house in Boise, Idaho? Homes near North End and across Boise often need layouts that respect Ada County codes and local inspection timelines. Boise Remodeling Co offers design-build adu / guest house with clear written scope, proactive weekly updates, and a written workmanship guarantee. Schedule a free in-home consultation or use our project estimator for a planning range.

ADU / Guest House

ADU / Guest House in Boise, Idaho

Looking for adu / guest house in Boise, Idaho? Homes near North End and across Boise often need layouts that respect Ada County codes and local inspection timelines. Boise Remodeling Co offers design-build adu / guest house with clear written scope, proactive weekly updates, and a written workmanship guarantee. Schedule a free in-home consultation or use our project estimator for a planning range.

Why choose us

Why homeowners choose us

  • Single team from design through certificate of occupancy, no coordinating separate trades
  • Ada and Canyon County, ADU permitting and setback requirements handled in-house
  • Rental-ready finish packages designed, for durability and appeal
  • Exterior materials and rooflines, planned to complement your existing home
Scope of work

What's included

  • Site feasibility evaluation and setback review
  • Foundation, framing, and structural engineering
  • Plumbing, electrical, and HVAC for a fully self-contained unit
  • Kitchen and bath fit-out with finish selections guidance
  • Permit coordination and final inspection through certificate of occupancy
How it works

Our process,
step by step

01

Site visit and feasibility

We review your lot, setbacks, utility access, and HOA rules to confirm the ADU approach that works best.

02

Design and engineering

Plans are drawn to meet code, match your property, and maximize livability within your investment target.

03

Permitting and construction

We file permits and manage every trade from foundation through finish with weekly written updates.

04

Inspections and closeout

Final inspections are coordinated and we walk through every detail before handoff.

Planning details

Typical timeline

Most ADU projects run 4 to 7 months from design through certificate of occupancy, depending on unit size, site conditions, and permit timelines.

Local details

Local notes

Permitting for adu / guest house projects in Boise runs through Ada County. We build permit timelines into your schedule from day one.

Common questions

Frequently asked questions

Start your project

Ready to begin?

Free 60 to 90 minute in-home visit. Planning guidance, design direction, no obligation.